
42km of piste, 918m vertical, family-friendly slopes in the Bernese Oberland. Part of Adelboden-Lenk region.
Betelberg spans 1,083 to 2,001 metres with 918 metres of vertical drop across 42 kilometres of piste and 17 marked runs. The terrain splits 52% beginner, 46% intermediate and 2% advanced, delivering an accessible layout ideal for families and developing skiers. The resort receives 4.3 metres of average annual snowfall and operates as part of the broader Adelboden-Lenk regional pass system, though Betelberg-only tickets run from 55 to 75 Swiss francs for adults. Base facilities sit just 600 metres from Lenk village centre.
Wide, groomed runs dominate the mountain, with the seven-kilometre Tschuggenpiste standing as the signature descent for stronger intermediates. Gentle terrain between Leiterli summit station and the Stoss mid-station appeals to beginners, whilst the Betelberg Cross Park, Joana Hählen Skimovie course and speed measurement track add variety. February delivers peak snow depth averaging 94 centimetres at 2,001 metres. A single black run accounts for just one kilometre of marked terrain.
Betelberg functions as Lenk's local mountain, drawing a relaxed, family-oriented crowd with minimal queuing even during peak periods. The Kinderwelt Stoss children's area includes the Swiss Snow Kids Village, conveyor lifts and dedicated instruction zones. Mid-mountain restaurants and the Berghotel Leiterli provide on-slope dining and lodging. 18 kilometres of winter hiking trails and 5 kilometres of cross-country tracks supplement the downhill offering.
Multi-day Adelboden-Lenk passes from two days upward grant access to 186 kilometres across the combined region including Metsch, Engstligenalp and Tschentenalp sectors. Dynamic pricing rewards early bookings. Children aged six to 15 ski free on Saturdays when accompanied by an adult with a day pass. The AlpsPass season card at 949 Swiss francs includes Betelberg within a network of participating resorts. The season typically runs early December through mid-April, with Betelberg opening from Christmas whilst the broader region starts late November.
Betelberg spreads 17 runs across 42 km of piste of terrain. It leans beginner at 52%, with 9 beginner runs to find your feet.
The 2025-26 season runs 1 December 2025 through 15 April 2026, delivering a 19-week operational window. Betelberg typically opens from Christmas onwards, with the broader Adelboden-Lenk region commencing operations from late November when early snow permits weekend skiing. Gondola operations extend to 4 April 2027 for the following season, with weekend-only service from late October through mid-December for hiking access.
Average annual snowfall measures 4.3 metres, with February historically delivering peak coverage of 94 centimetres at 2,001-metre summit elevation and 15 centimetres at base. The Wildstrubel massif to the south blocks Mediterranean weather systems whilst channelling northern snow-bearing fronts into the valley, supporting natural accumulation. January averages three sunny days per month. The resort ranks within the Bernese Oberland's top ten for snow reliability despite the modest base elevation of 1,083 metres.
February and early March provide optimal powder windows and consistent cover, whilst April transitions to spring corn snow conditions. Mid-January through mid-February sees peak visitor numbers coinciding with school holidays. Early December and late March offer quieter slopes with reduced lift ticket pricing under the dynamic model. Night skiing programmes do not operate at Betelberg, though the neighbouring Chuenisbärgli sector hosts Friday evening sessions in February.
The annual Audi FIS Ski World Cup stages giant slalom and slalom races in Adelboden during mid-January, drawing international attention to the region. Saturday's KidsFree promotion runs throughout the season. The Joana Hählen Skimovie course honours the Swiss World Cup racer. Evening fondue events and regional culinary programming feature at on-mountain restaurants during peak season.
Betelberg rises directly above Lenk im Simmental at the southern terminus of the Simmental valley in the Bernese Oberland, Canton Bern. Lenk sits at 1,068 metres elevation with the village spreading across the valley floor beneath the Wildstrubel massif at 3,243 metres, which forms a natural wall separating the Simmental from Valais to the south. The gondola base station lies 600 metres from Lenk's centre, with parking available at the valley terminal. The Simme River emerges from the Siebenbrunnen glacial springs above the village.
Zweisimmen lies 18 kilometres north via the Simmental road, connecting to Spiez, Thun and Lake Thun beyond. Gstaad sits 20 kilometres west over the Saanenmöser pass. Adelboden, the linked resort accessible via the Hahnenmoos col during winter, sits one valley east in the Engstligental. The Obersimmental designation covers the upper valley from Lenk northward to Boltigen. Regional population centres include Thun at 40 kilometres and the capital Bern at 75 kilometres northwest.
Road access follows the A6 Bern-Thun motorway to the Wimmis-Zweisimmen exit, then cantonal road through the Simmenfluh tunnel into the Simmental valley. Drive time from Bern measures one hour; Basel requires two hours via the A1 and A6 motorways. The well-maintained Simmental road permits year-round access without requiring winter chains during standard conditions. From the south, the Jaun Pass links to Bulle in Canton Fribourg.
Bern-Belp Airport sits 75 kilometres distant with 90-minute transfer times, serving as the nearest commercial facility. Zürich Airport lies 200 kilometres east with three-hour-50-minute rail connections via Bern and Zweisimmen, requiring two changes. Geneva Airport measures 180 kilometres southwest with three-hour-30-minute train journeys. The RegioExpress Lötschberger runs hourly from Bern to Zweisimmen, connecting to the regional train terminating at Lenk station. The GoldenPass Panoramic train links Montreux to Zweisimmen with onward connections to Lenk.
Hotels and lodges near Betelberg, powered by Stay22.

I'm not a gamer. I'm a skier and snowboarder who happens to have a laptop. So when a ski resort management game called Ski-E-O! landed on Steam, I wasn't expecting to lose an afternoon to it - but here we are. Real mountain terrain, a full weather system, storms that roll in and wreck your snow base, avalanche danger, and enough depth to make RollerCoaster Tycoon feel simple by comparison. Early access lands in November. Here's what a few hours in the free demo actually looks like.

The rumours are true: Sugar Bowl is tearing out its Emerald gondola, in place since 1983, and replacing it with a new 8-person Doppelmayr system - nearly doubling uphill capacity to 1,800 people an hour. It's the fourth generation of a gondola line that dates back to 1953, when Sugar Bowl became the first resort on the West Coast to run one at all, and it's just one piece of a $100 million overhaul touching lodges, parking and snowmaking. Here's what's changing, and what's staying the same.

The death toll from Thursday night's fire at Restaurant Beverin in Thusis, Switzerland, has begun to firm up. One Swiss outlet, citing Graubünden Cantonal Police, reports that two of the five people initially reported missing have now been confirmed dead, leaving three unaccounted for. The building's collapsed stairwell and structural instability have slowed recovery efforts throughout. Here's what's changed since the fire broke out, and what's still unconfirmed.

Selwyn Snow Resort has called an early end to its 2026 season, a day after Victoria's Mount Baw Baw did the same. Rain on Thursday stripped what was left of the snowpack, and the cold nights needed to rebuild it through snowmaking never arrived. It's a rough result for a resort that only just found its footing again after being burned to the ground in the 2019-20 Black Summer bushfires and a multi-year rebuild. Here's how the season fell apart, and where Selwyn's been since the fire.

Mt Baw Baw is calling time on its 2026 season this Sunday at 5pm, becoming the first Australian resort to close for the year after warm spells and rain wore through its snowpack. Lifts stop, but the resort stays open, entry fees get waived, and there's one last Bollywood Weekend before the lights go out. Fifty-seven days after opening, here's how the season ended and what it means for the rest of Australia's struggling snowpack.

Arosa's Hörnli sector is getting its biggest overhaul in decades. The 1986 gondola and 1994 chairlift linking toward Lenzerheide are both being replaced, with capacity up, tower count down and a new base station lower on the hill. At roughly CHF 67 million, it is the largest single investment Arosa Bergbahnen has ever made - and the target opening has already slipped a year, to December 2028. Here is what is changing, and why the timeline moved.

Sundance Mountain Resort's back mountain is finally getting a proper lift. The Electric Horseman Express opens for 2026-27, unlocking a new bowl next to Bishop's Bowl and three expert gladed chutes across roughly 105 fresh acres - on top of the Storyteller ridge run that debuted in preview form last season. It's Sundance's biggest expansion since 1985, and it turns a three-lift slog into a single six-minute ride to Bearclaw Summit.

Finland's Levi and Ruka open for the 2026-27 season on October 2, more than seven weeks before most of Europe sees a lift turn. Neither resort is waiting on autumn snowfall - both are skiing on snow buried since last spring, insulated through the Finnish summer and dug back out for opening day. It is not a shortcut. It is a decades-old system now spreading from the Arctic Circle to Idaho, Utah, Vermont and Colorado. Here is how snow farming actually works, and why it is catching on.
Betelberg operates 11 lifts comprising two gondolas, two quad chairs, two six-seat chairs, four T-bars and one moving carpet. Total uphill capacity reaches 11,800 people per hour. The two-stage Garaventa gondola system built in 1996 forms the backbone, carrying six passengers per cabin from Lenk at 1,083 metres to Stoss mid-station at 1,634 metres, then continuing to Leiterli summit at 1,946 metres.
The Lenk-Wallegg quad chair by Städeli covers 1,813 metres with 1,420-person hourly capacity, accessing a parallel ascent route. The Wallegg-Mülkerblatten detachable quad, also Städeli-built in 1989, transports 1,800 riders per hour across 1,461 metres of length. Both chairs serve the upper mountain's intermediate terrain and connect back to valley descents.
The Stoss-Leiterli gondola section runs 2,011 metres at five metres per second with seven-minute transit time and 1,300-person capacity. Surface lifts including the Haslerberg T-bar, Balmen, Roszun and Mauren tows supplement chairlift networks, primarily serving beginner zones and shorter runs. The Kinderland Stoss conveyor serves nursery slopes adjacent to the mid-station facilities.
The 1996 gondola installations represent the most significant infrastructure, with the Städeli chairlifts dating to 1989 forming the secondary access network. Uphill flow avoids bottlenecks through dual ascent routes from base level. The compact vertical spread and short lift rides keep circuit times efficient for lap-focused intermediates. No major upgrades have been announced for upcoming seasons, though standard maintenance and gearbox overhauls maintain operational reliability.
More Betelberg intelligence: trail map, snow report, webcams, resort overview.