SnowStash
ForecastsCompareNews
SnowStash Logo

Live snow, webcams and expert resort guides for the world's mountains - plan your next day on snow.

hello@snowstash.com
Download on the App Store

Destinations

  • Australia
  • Canada
  • Europe
  • Japan
  • New Zealand
  • United States

Company

  • About Us
  • Work With Us
  • Privacy Policy

Explore

  • Compare Resorts
  • News & Updates
  • Snow Forecast
  • Mobile App

© 2026 SnowStash. All rights reserved.

    1. Home
    2. /
    3. News

    Loon Mountain Commences New South Peak Expansion

    Michael FultonMichael Fulton·25 Mar 2023

    TL;DR

    Loon Mountain Resort has begun the construction of the South Peak Expansion 2, also known as Electric Boogaloo. The project will add new trails and lifts for beginner and intermediate skiers, with 30+ acres of skiable terrain, fully automated snowmaking technology, and frost-free pipes. The area will be serviced by a Doppelmayr Alpenstar quad-CLF chairlift, and surface lifts may be added in the future.

    Level Up Your Ski Day — Download SnowStash on the App Store

    Loon Mountain's South Peak Expansion 2, commonly known as Electric Boogaloo, has commenced with impressive progress. Loon Mountain Resort recently reported that the construction of new trails and lifts for beginner and intermediate skiers is underway. As of now, the clearances of runs are complete, which skiers on Escape Route or Cruiser trails can attest to. The components for the new quad chairlift from Doppelmayr and snowmaking pipes have also arrived on-site, indicating a promising start to the project, even though it is only March. The expansion, set to offer 30+ acres of skiable terrain, will substantially increase beginner and intermediate runs on South Peak. The project will boost the resort's current small number of easy runs by 50%, and the area will also have fully automated snowmaking technology and frost-free pipes. The terrain pod will be served by a Doppelmayr Alpenstar quad-CLF chairlift with a loading conveyor that will transport riders up to the Cruiser trail. Surface lifts may be added to the area, but it remains unclear whether this will be done for the 2023-24 season or at a later time. Additionally, the expansion aims to increase the South Peak Resort's real estate development. Currently, only 30% of the potential development at South Peak has been fulfilled, implying that more homes, townhomes, and condominiums will be added in the future.

    Loon Mountain South Peak Expansion Aerial

    An aerial shot over the new South Peak expansion at Loon Mountain. Credit: Loon Mountain Resort Loon Mountain Growing ResponsiblyFor each tree removed from property, more will be planted thanks to One Tree Planted. Loon has made a donation to this organization which is one of the U.S. National Forest’s official reforestation partners. This ensures that more trees are planted than were removed from the site. Some of the lumber was chipped and sent to a local biomass plant to be converted to energy while the rest was sent to local mills. Learn more about our commitment to growing responsibly, a pillar of Flight Path: 2030.

    Loon Mountain Trail Map

    About the author

    Michael Fulton

    Michael Fulton

    Melbourne-based skier and snowboarder with 50+ resorts across 5 continents. Specialises in Australian resorts and international resort comparisons.

    50+ resorts visited15 years skiing

    Keep reading

    More from the SnowStash desk

    View all news →
    Arosa to Replace 40-Year-Old Hörnli Lifts With New Gondola and Chair

    Arosa to Replace 40-Year-Old Hörnli Lifts With New Gondola and Chair

    Arosa's Hörnli sector is getting its biggest overhaul in decades. The 1986 gondola and 1994 chairlift linking toward Lenzerheide are both being replaced, with capacity up, tower count down and a new base station lower on the hill. At roughly CHF 67 million, it is the largest single investment Arosa Bergbahnen has ever made - and the target opening has already slipped a year, to December 2028. Here is what is changing, and why the timeline moved.

    20 Aug 2026
    Sundance Mountain Resort Is Getting a New High-Speed Quad and More Back Mountain Terrain This Winter

    Sundance Mountain Resort Is Getting a New High-Speed Quad and More Back Mountain Terrain This Winter

    Sundance Mountain Resort's back mountain is finally getting a proper lift. The Electric Horseman Express opens for 2026-27, unlocking a new bowl next to Bishop's Bowl and three expert gladed chutes across roughly 105 fresh acres - on top of the Storyteller ridge run that debuted in preview form last season. It's Sundance's biggest expansion since 1985, and it turns a three-lift slog into a single six-minute ride to Bearclaw Summit.

    19 Aug 2026
    Levi and Ruka Confirm October 2 Opening on Farmed Summer Snow

    Levi and Ruka Confirm October 2 Opening on Farmed Summer Snow

    Finland's Levi and Ruka open for the 2026-27 season on October 2, more than seven weeks before most of Europe sees a lift turn. Neither resort is waiting on autumn snowfall - both are skiing on snow buried since last spring, insulated through the Finnish summer and dug back out for opening day. It is not a shortcut. It is a decades-old system now spreading from the Arctic Circle to Idaho, Utah, Vermont and Colorado. Here is how snow farming actually works, and why it is catching on.

    19 Aug 2026
    Sölden's Old Einzeiger Chairlift Gets a Second Life in Montafon

    Sölden's Old Einzeiger Chairlift Gets a Second Life in Montafon

    Silvretta Montafon is replacing its ageing Freda chairlift - but not with something new. The resort is having a 1999 four-seater chairlift, retired from Sölden, dismantled, shipped to Vorarlberg and rebuilt with new electronics, cable and clamps. It has to be running before March 2027, when Silvretta Montafon hosts the FIS Snowboard, Freestyle and Freeski World Championships - the biggest winter sports event Vorarlberg has staged. Here's how a reused lift ends up cheaper.

    18 Aug 2026
    Nassfeld Invests €13 Million in New 6-Seater Chairlift for 2026/27 Season

    Nassfeld Invests €13 Million in New 6-Seater Chairlift for 2026/27 Season

    Nassfeld is putting €13 million into a new 6-seater chairlift, the Tressdorfer Almbahn, connecting Sonnleitn with the Tressdorfer Alm from December 2026. It replaces three ageing drag lifts and will run through summer too, from June 2027, moving up to 2,500 people an hour on the roughly three-minute ride. It's the latest step in Carinthia's largest ski resort building out a genuine year-round offering, following last year's Gartnerkofelbahn gondola.

    17 Aug 2026
    Stelvio Glacier Suspends Summer Skiing, Leaving Continental Europe Without a Lift-Served Slope

    Stelvio Glacier Suspends Summer Skiing, Leaving Continental Europe Without a Lift-Served Slope

    Italy's Stelvio Glacier has pulled the plug on summer skiing from August 15. It was the last lift-served ski option left standing in continental Europe, and now there's none. Operator SIFAS pointed to persistent heat, storms, and a snowpack that simply wasn't refreezing overnight anymore. The cable car keeps running. Whether skiing comes back later this summer depends on the weather turning - and right now, nobody's promising anything.

    15 Aug 2026
    Maverick Mountain's Only Chairlift Destroyed as Sand Creek Fire Tears Through Montana Ski Area

    Maverick Mountain's Only Chairlift Destroyed as Sand Creek Fire Tears Through Montana Ski Area

    Firefighters saved every base building at Maverick Mountain, Montana, but the resort's sole chairlift didn't survive the Sand Creek Fire. Owners Erik and Kristi Borge say the lift is "most likely" out for the 2026/27 season after flames tore through the mountain on August 8. The wildfire has since grown past 27,700 acres with zero percent containment. It's a gutting result for the tiny, one-lift operation near Dillon - though the lodge, groomers and equipment all made it through untouched.

    15 Aug 2026
    Fairmont Niseko: New Luxury Resort Revives Stalled La Plume Site for Early 2028 Opening

    Fairmont Niseko: New Luxury Resort Revives Stalled La Plume Site for Early 2028 Opening

    Fairmont is bringing its second Japanese property to Niseko, and this one's got history. The 165-room resort will rise on the site of the stalled La Plume project, which collapsed into bankruptcy in 2025 before J-Will Partners bought the site for redevelopment. Set between Mount Yotei and Mount Annupuri, it's slated for an early 2028 opening - putting it in play for the 2027/28 season. Expect two restaurants, a spa, onsen bathing, and a kids' club, a short drive from Niseko Village and Hirafu.

    12 Aug 2026