SnowStash
ForecastsCompareNews
SnowStash Logo

Live snow, webcams and expert resort guides for the world's mountains - plan your next day on snow.

hello@snowstash.com
Download on the App Store

Destinations

  • Australia
  • Canada
  • Europe
  • Japan
  • New Zealand
  • United States

Company

  • About Us
  • Work With Us
  • Privacy Policy

Explore

  • Compare Resorts
  • News & Updates
  • Snow Forecast
  • Mobile App

© 2026 SnowStash. All rights reserved.

    Switzerland, Europe

    Arosa Lenzerheide

    225km of piste, 52 lifts, 1,636m vertical. Largest ski area in Graubünden, linked by cable car since 2013.

    Season 2025 - 2026
    Opens
    23 Nov 2025
    Closes
    21 Apr 2026
    Days open
    149
    Annual snow
    4m
    The Overview
    MF
    Michael Fulton
    Melbourne-based skier and snowboarder with 50+ resorts across 5 continents. Specialises in Australian resorts and international resort comparisons.

    Arosa Lenzerheide spans 225 kilometres of piste across an elevation range of 1,229 to 2,865 metres, making it the largest contiguous ski area in Graubünden. The resort comprises 117 runs served by 52 lifts, with a terrain split of 49 per cent beginner, 39 per cent intermediate and 12 per cent advanced. Since the winter of 2013/14, the formerly separate resorts of Arosa and Lenzerheide have been linked by the Urdenbahn aerial tramway, a pillar-free cable car that crosses the Urden valley in five minutes. Snow reliability benefits from both altitude and comprehensive snowmaking across 60 per cent of slopes, with an average annual snowfall of 4.3 metres.

    The ski area divides into distinct sectors: the Arosa side centred on Weisshorn at 2,653 metres and Hörnli at 2,511 metres, and the Lenzerheide side dominated by Parpaner Rothorn at 2,865 metres, the resort's highest point. Beginner terrain concentrates around valley stations at Tschuggen in Arosa and practice areas like Auarara and Fastatsch in Lenzerheide. Intermediates navigate the bulk of the terrain via long cruising runs such as those from Hörnli and Weisshorn, whilst advanced skiers target the Silvano Beltrametti World Cup downhill run in Lenzerheide, which reaches gradients of 66 per cent. Four terrain parks and 103 kilometres of cross-country trails supplement the alpine offering.

    Arosa sits at 1,775 metres in the innermost Schanfigg valley, a car-free resort accessible by narrow-gauge railway from Chur. Lenzerheide spreads across a high plateau at 1,500 metres, surrounded by the villages of Valbella, Parpan and Churwalden. Both sectors offer east- and west-facing slopes, creating a sun-trap effect throughout the day. Mountain restaurants number over 30 across the combined area, with facilities ranging from traditional huts to modern self-service stations. The atmosphere tilts towards families and intermediates, with quieter crowds than neighbouring Davos or St Moritz.

    A single Arosa Lenzerheide lift pass covers all 52 installations, with adult day tickets priced at 74 Swiss francs off-peak and 84 francs during high season. The TOPCARD annual pass, valid here and at other Graubünden resorts, costs 1,299 francs. The 2025/26 season runs from 23 November 2025 to 21 April 2026. Night skiing operates on Fridays from early January to mid-March on the 3.5-kilometre Stätzerhorn piste. The resort suits intermediates seeking mileage, families requiring varied terrain, and those wanting a traditional Swiss mountain base without the scale or expense of larger resorts.

    1636m
    Vertical
    117
    Runs
    225 km
    Piste
    4m
    Annual snow
    The Terrain

    117 runs across 225 km of piste

    Arosa Lenzerheide spreads 117 runs across 225 km of piste of terrain. It leans beginner at 49%, with 57 beginner runs to find your feet and 14 advanced or expert runs when you want to push.

    Terrain split
    117
    runs
    117 runs across 4 grades
    Beginner57 runs · 49%
    Intermediate46 runs · 39%
    Advanced14 runs · 12%
    Expert0 runs · 0%
    Time it right

    When to visit Arosa Lenzerheide

    The 2025/26 season at Arosa Lenzerheide operates from 23 November 2025 to 21 April 2026, spanning five months of lift-served skiing. Early-season opening typically focuses on higher sectors around Hörnli and Rothorn before valley connections to Churwalden open by mid-December. Arosa's east-facing bowl often permits November skiing thanks to cold temperatures and aggressive snowmaking, whilst Lenzerheide's west-facing slopes benefit from afternoon sun retention into April. Spring skiing extends to late April on north-facing runs above 2,400 metres.

    Annual snowfall averages 439 centimetres on-mountain, with Arosa village recording over seven metres at its 1,775-metre elevation. The resort's altitude span provides natural snow reliability, with 60 per cent of pistes covered by 110 kilometres of snowmaking infrastructure installed progressively between 2016 and 2024. Sections between Parpan and Churwalden received enhanced snowmaking in 2016 to guarantee valley access. Base depth during the 2025/26 season has maintained 90 centimetres mid-winter. The high-alpine environment and dual-valley aspect create microclimates, with Rothorn's northern exposure holding powder longer than sun-soaked Weisshorn runs.

    January and February deliver the most consistent snow conditions, with the first week of February historically registering peak accumulation. December offers pre-Christmas value with fewer crowds but variable lower-elevation cover. March combines reliable upper-mountain snow with lengthening daylight and warming temperatures, ideal for spring skiing and terrace sessions. Easter week draws family crowds regardless of calendar date. Weekdays from mid-January to early March provide optimal touring conditions with open lifts, groomed pistes and manageable visitor numbers.

    The FIS Ski Cross World Cup visits Arosa in mid-December, staging races on a purpose-built course at Innerarosa beside the historic Bergkirchli church. Night skiing runs every Friday from early January through mid-March on the Stätzerhorn sector, with the 3.5-kilometre floodlit piste accessed via the Proschieri T-bar and Rungg-Stätzertäli chair operating until 10pm. Tour de Ski cross-country stages have been held at Lenzerheide's Nordic facilities. The Arosa Humour Festival in December and Lenzerheide's Enchanted Forest light installation add cultural programming. No summer glacier skiing exists, with lifts closing entirely between late April and early June before reopening for mountain biking season.

    Season 2025 - 2026
    23 Nov 2025
    Opens
    21 Apr 2026
    Closes
    149
    Days open
    4 m
    Annual snow
    Getting there

    Getting to Arosa Lenzerheide, and where to stay

    Arosa Lenzerheide occupies two parallel valleys in Graubünden, eastern Switzerland's largest canton. Arosa sits at the head of the Schanfigg valley at 1,775 metres, accessible only via a dead-end road climbing 1,320 metres from Chur through 360 hairpin bends over 30 kilometres. Lenzerheide spreads across a high plateau between Chur and Tiefencastel at elevations from 1,229 to 1,500 metres, positioned on the historic Julier Pass route connecting the Rhine valley to the Engadin. The resort spans the municipalities of Arosa, Lenzerheide, Valbella, Parpan and Churwalden, with the Plessur Alps rising to the north and east.

    Chur, Switzerland's oldest city and capital of Graubünden, lies 30 kilometres northwest of Arosa and 13 kilometres north of Lenzerheide. The regional centre provides rail connections, supermarkets and cantonal government services. St Moritz sits 80 kilometres south via the Julier Pass, Davos 40 kilometres east over the Wolfgang Pass. The car-free resort of Arosa maintains its isolated character at the valley terminus, surrounded by peaks including Weisshorn, Hörnli and Brüggerhorn. Lenzerheide's more accessible position on the main Chur-St Moritz corridor historically attracted pass traffic before developing into a destination resort.

    Road access channels through the A13 motorway, the primary north-south artery through eastern Switzerland connecting Austria to Italy via the San Bernardino tunnel. Drivers approaching from Zürich or northern Europe exit at Chur Nord (exit 16) and follow mountain roads to either valley. The Arosa route via the Schanfiggerstrasse requires 40 minutes from Chur on a narrow, winding road often demanding snow chains in winter. Lenzerheide proves easier to reach via a 19-minute drive from the same Chur exit or 25 minutes from Thusis Süd. Churwalden's Panoramabahn Heidbüel lift serves as the optimal day-visitor entry point from the north. Parking fees apply at all resort base areas.

    Zürich Airport, Switzerland's largest, lies 154 kilometres northwest, a two-hour drive in good conditions or three hours by public transport. Friedrichshafen Airport across the German border sits 155 kilometres away, also two hours by road. Rail access runs via Zürich Hauptbahnhof to Chur, where connections diverge: the Rhaetian Railway's narrow-gauge line winds directly to Arosa station in one hour, depositing passengers opposite the Weisshorn cable car. Lenzerheide receives post bus service from Chur station, with the number 182 Postbus reaching Lenzerheide in 40 minutes. Arosa Lenzerheide lift passes include free travel on Chur-Arosa and Chur-Lenzerheide-Tiefencastel public transport routes. Transfer companies operate shared and private shuttles from Zürich, Friedrichshafen and regional train stations year-round.

    Where to stay

    Search all stays →

    Hotels and lodges near Arosa Lenzerheide, powered by Stay22.

    Latest News

    From the SnowStash desk

    View all news →
    Thredbo Is 'On the Table' as EVT Reviews Its Whole Business

    Thredbo Is 'On the Table' as EVT Reviews Its Whole Business

    Thredbo is officially 'on the table.' EVT Limited, owner of Australia's most decorated ski resort, has hired Rothschild & Co to review its entire corporate structure - and confirmed Thredbo isn't off limits, even as it books a stronger year of earnings. The resort's own valuation has nearly halved after a brutal 2026 season, and speculation is already running toward Vail Resorts, Alterra, or a New Zealand operator picking it up. Here's what EVT actually said, and who could buy it.

    25 Aug 2026
    Ski-E-O! Is the Ski Resort Tycoon Game We Didn't Know We Needed

    Ski-E-O! Is the Ski Resort Tycoon Game We Didn't Know We Needed

    I'm not a gamer. I'm a skier and snowboarder who happens to have a laptop. So when a ski resort management game called Ski-E-O! landed on Steam, I wasn't expecting to lose an afternoon to it - but here we are. Real mountain terrain, a full weather system, storms that roll in and wreck your snow base, avalanche danger, and enough depth to make RollerCoaster Tycoon feel simple by comparison. Early access lands in November. Here's what a few hours in the free demo actually looks like.

    23 Aug 2026
    Sugar Bowl, California, Rebuilds Its Historic Village Gondola

    Sugar Bowl, California, Rebuilds Its Historic Village Gondola

    The rumours are true: Sugar Bowl is tearing out its Emerald gondola, in place since 1983, and replacing it with a new 8-person Doppelmayr system - nearly doubling uphill capacity to 1,800 people an hour. It's the fourth generation of a gondola line that dates back to 1953, when Sugar Bowl became the first resort on the West Coast to run one at all, and it's just one piece of a $100 million overhaul touching lodges, parking and snowmaking. Here's what's changing, and what's staying the same.

    23 Aug 2026
    Two Confirmed Dead as Search Continues After Swiss Alps Fire

    Two Confirmed Dead as Search Continues After Swiss Alps Fire

    The death toll from Thursday night's fire at Restaurant Beverin in Thusis, Switzerland, has begun to firm up. One Swiss outlet, citing Graubünden Cantonal Police, reports that two of the five people initially reported missing have now been confirmed dead, leaving three unaccounted for. The building's collapsed stairwell and structural instability have slowed recovery efforts throughout. Here's what's changed since the fire broke out, and what's still unconfirmed.

    22 Aug 2026
    Selwyn Snow Resort Closes Early as Rain Ends Its 2026 Season

    Selwyn Snow Resort Closes Early as Rain Ends Its 2026 Season

    Selwyn Snow Resort has called an early end to its 2026 season, a day after Victoria's Mount Baw Baw did the same. Rain on Thursday stripped what was left of the snowpack, and the cold nights needed to rebuild it through snowmaking never arrived. It's a rough result for a resort that only just found its footing again after being burned to the ground in the 2019-20 Black Summer bushfires and a multi-year rebuild. Here's how the season fell apart, and where Selwyn's been since the fire.

    22 Aug 2026
    Mt Baw Baw Becomes First Australian Resort to Close for 2026

    Mt Baw Baw Becomes First Australian Resort to Close for 2026

    Mt Baw Baw is calling time on its 2026 season this Sunday at 5pm, becoming the first Australian resort to close for the year after warm spells and rain wore through its snowpack. Lifts stop, but the resort stays open, entry fees get waived, and there's one last Bollywood Weekend before the lights go out. Fifty-seven days after opening, here's how the season ended and what it means for the rest of Australia's struggling snowpack.

    21 Aug 2026
    Arosa to Replace 40-Year-Old Hörnli Lifts With New Gondola and Chair

    Arosa to Replace 40-Year-Old Hörnli Lifts With New Gondola and Chair

    Arosa's Hörnli sector is getting its biggest overhaul in decades. The 1986 gondola and 1994 chairlift linking toward Lenzerheide are both being replaced, with capacity up, tower count down and a new base station lower on the hill. At roughly CHF 67 million, it is the largest single investment Arosa Bergbahnen has ever made - and the target opening has already slipped a year, to December 2028. Here is what is changing, and why the timeline moved.

    20 Aug 2026
    Sundance Mountain Resort Is Getting a New High-Speed Quad and More Back Mountain Terrain This Winter

    Sundance Mountain Resort Is Getting a New High-Speed Quad and More Back Mountain Terrain This Winter

    Sundance Mountain Resort's back mountain is finally getting a proper lift. The Electric Horseman Express opens for 2026-27, unlocking a new bowl next to Bishop's Bowl and three expert gladed chutes across roughly 105 fresh acres - on top of the Storyteller ridge run that debuted in preview form last season. It's Sundance's biggest expansion since 1985, and it turns a three-lift slog into a single six-minute ride to Bearclaw Summit.

    19 Aug 2026

    Lift system

    Arosa Lenzerheide operates 52 lifts comprising four aerial tramways, four gondolas, three eight-seat chairlifts, seven six-seat chairs, 10 quad chairs, three triple chairs, five surface lifts and 16 T-bars. The combined uphill capacity approaches 65,000 skiers per hour. Lift operations run from 8.30am to approximately 4.30pm depending on sector and time of season. The Arosa sector accounts for 14 lifts whilst Lenzerheide's east and west sides split 24 installations, with Churwalden adding four.

    The Urdenbahn stands as the system's centrepiece, built in 2013 by Austrian-Swiss manufacturer Steurer Seilbahnen. This pillar-free twin-cable aerial tramway spans 1,682 metres between Hörnli and Urdenfürggli without intermediate support towers, relying on 17 large cable stabilisers. Two Gangloff-designed cabins each carry 150 passengers at 12 metres per second, completing the crossing in five minutes including station dwell time. The hourly capacity reaches 1,700 persons per direction, and the system can operate on a single cabin during low ridership. On the Arosa side, the two-stage Weisshorn cable car climbs from the base station at 1,739 metres to the summit at 2,653 metres, carrying 125 passengers per cabin. The Hörnli-Express six-seat gondola accesses the western sector from Inner-Arosa.

    Lenzerheide's Rothorn network combines an eight-seat gondola from Canols to Scharmoin at 2,283 metres with a 58-person aerial tramway to the 2,865-metre summit. Six-seat detachable chairs including Stätzerhorn, Heimberg-Motta and Motta-Urdenfürggli provide rapid access to mid-mountain terrain. The Brüggerhorn six-seat chair in Arosa, rebuilt in 2019, features Porsche-designed seating and modern bubble covers. The 2024 replacement of the Stätzertäli quad chair by LEITNER incorporated DirectDrive technology and retained existing tower foundations to minimise environmental impact. Most main chairs are detachable high-speed installations built within the past 15 years.

    The Obertor quad chair in Parpan creates an east-west link across the Lenzerheide valley floor, eliminating the need for bus transfers between opposite sides of the resort. Practice lifts concentrate at valley level, with magic carpets and button lifts serving beginner areas at Tschuggen, Auarara and Heimberg. A private funicular connects the Tschuggenhotel to Tschuggenhütte. Recent investments include upgraded snowmaking infrastructure along key descents, roller battery replacements on the Carmenna chair, and solar panel installations on six-seat chair roofs at Lenzerheide. Queue times remain minimal outside peak Christmas and February weeks, with lift-to-terrain ratios favouring flow over bottlenecks.

    52lifts across 8 types
    4
    Aerial Trams
    4
    Gondolas
    3
    8-Person Chairs
    7
    6-Person Chairs
    10
    Quad Chairs
    3
    Triple Chairs
    16
    T-Bars
    5
    Surface Lifts

    Arosa Lenzerheide lift system

    Arosa Lenzerheide is served by 52 lifts, listed here by type. Check which lifts are turning against the live conditions before you plan your first laps - early lifts and high-speed chairs get you to the best snow fastest.

    More Arosa Lenzerheide intelligence: trail map, snow report, webcams, resort overview.