SnowStash
ForecastsCompareNews
SnowStash Logo

Live snow, webcams and expert resort guides for the world's mountains - plan your next day on snow.

hello@snowstash.com
Download on the App Store

Destinations

  • Australia
  • Canada
  • Europe
  • Japan
  • New Zealand
  • United States

Company

  • About Us
  • Work With Us
  • Privacy Policy

Explore

  • Compare Resorts
  • News & Updates
  • Snow Forecast
  • Mobile App

© 2026 SnowStash. All rights reserved.

    1. Home
    2. /
    3. News
    EuropeSilvretta MontafonAustria

    Silvretta Montafon Plans New 10-Person Gondola to Replace Ageing Hochjoch Lift

    Michael FultonMichael Fulton·5 Aug 2026

    TL;DR

    Silvretta Montafon wants to retire one of its most distinctive lifts. The plan: a single 10-person gondola running direct from Schruns to 1,870 metres, replacing both the two-stage Hochjoch cable car and the 1985 Kropfen chairlift in one move. Capacity jumps from 620 to 3,000 people an hour, and the mid-station transfer disappears entirely. The public hearing lands August 27, 2026 - construction hasn't been confirmed yet, though lift databases are pointing to 2027.

    Level Up Your Ski Day — Download SnowStash on the App Store

    Silvretta Montafon wants to replace one of its most recognisable cable cars, and the plan calls for a single gondola doing the job two lifts currently split between them.

    The resort filed a nature conservation permit application at the start of July for a new Hochjoch cable car - a detachable single-cable gondola with 10-person cabins running direct from Schruns to a summit station at 1,870 metres. The system would stretch roughly 3,240 metres and climb more than 1,150 metres in altitude, with a projected ride time of around ten minutes at a top speed of 6 metres per second.

    No more swapping gondolas partway up

    The current Hochjoch lift runs in two sections. Guests board in Schruns, ride to the Kropfen mid-station at 1,335 metres, then have to change gondolas for the second leg up to Kapell. Four cabins altogether, each holding 54 people, keep that system running. The new gondola does away with the transfer completely - cabins would be in constant circulation, so there's no waiting around for a large gondola to depart, and skiers get a straight run to the top even on the busiest mornings.

    The existing Kropfen double lift that the new gondola is replacing.
    The existing Kropfen double lift that the new gondola is replacing.

    A five-fold jump in capacity

    Where the existing setup tops out at 620 people an hour, the new gondola is designed to move up to 3,000. That capacity gap looks like the real driver behind the project - a four-cabin system simply can't flex the way a modern circulating gondola can, where cabins are arriving constantly rather than on a fixed schedule.

    The Hochjoch lift isn't just a winter fixture, either. Hikers and mountain bikers rely on it through summer as the access point for several Hochjoch routes, and it's currently the only way to get bikes up that side of the mountain.

    The Kropfen chairlift goes too

    The project doesn't stop at the gondola. The old Kropfen chairlift - a fixed-grip, two-person lift built in 1985, capable of moving 1,000 people an hour - is also being retired as part of the same plan. That lift currently takes around seventeen minutes to shuttle riders up towards the higher ski area, a job the new gondola would absorb. One project, two lifts removed from the network. What happens to the land, station buildings, and old lift lines hasn't been detailed yet.

    The location of the new gondola at Silvretta Montafon in Austria
    The location of the new gondola at Silvretta Montafon in Austria

    The end of a lift dating back to 1966

    Replacing the Hochjoch cable car closes out a fairly unusual chapter in the resort's lift history. The first connection between Schruns and the mountain opened in 1950, with a second section added the following year between Kropfen and the Kapellalpe. That original setup was replaced in 1966 by the four-cabin system still running today, which went through a substantial modernisation in 1992. Two-section gondolas requiring a mid-ride transfer are rare in modern ski infrastructure, which has made this one something of a curiosity among cable car circles - though its limited capacity is exactly why it's being phased out.

    Approval still to come

    Nothing is finalised yet. The public hearing on the permit application is set for August 27, 2026, giving involved parties and immediate neighbours a window to review the project documents. Silvretta Montafon hasn't released investment figures, a manufacturer, or a construction schedule. A specialist lift database lists 2027 as a possible build year, but the resort itself hasn't confirmed that timeline. Until the approval process wraps up, there's no word on when the current Hochjoch cable car will run its final trips or which winter season will see skiers riding the new gondola for the first time.

    About the author

    Michael Fulton

    Michael Fulton

    Melbourne-based skier and snowboarder with 50+ resorts across 5 continents. Specialises in Australian resorts and international resort comparisons.

    50+ resorts visited15 years skiing

    Keep reading

    More from the SnowStash desk

    View all news →
    Sundance Mountain Resort Is Getting a New High-Speed Quad and More Back Mountain Terrain This Winter

    Sundance Mountain Resort Is Getting a New High-Speed Quad and More Back Mountain Terrain This Winter

    Sundance Mountain Resort's back mountain is finally getting a proper lift. The Electric Horseman Express opens for 2026-27, unlocking a new bowl next to Bishop's Bowl and three expert gladed chutes across roughly 105 fresh acres - on top of the Storyteller ridge run that debuted in preview form last season. It's Sundance's biggest expansion since 1985, and it turns a three-lift slog into a single six-minute ride to Bearclaw Summit.

    19 Aug 2026
    Nassfeld Invests €13 Million in New 6-Seater Chairlift for 2026/27 Season

    Nassfeld Invests €13 Million in New 6-Seater Chairlift for 2026/27 Season

    Nassfeld is putting €13 million into a new 6-seater chairlift, the Tressdorfer Almbahn, connecting Sonnleitn with the Tressdorfer Alm from December 2026. It replaces three ageing drag lifts and will run through summer too, from June 2027, moving up to 2,500 people an hour on the roughly three-minute ride. It's the latest step in Carinthia's largest ski resort building out a genuine year-round offering, following last year's Gartnerkofelbahn gondola.

    17 Aug 2026
    Stelvio Glacier Suspends Summer Skiing, Leaving Continental Europe Without a Lift-Served Slope

    Stelvio Glacier Suspends Summer Skiing, Leaving Continental Europe Without a Lift-Served Slope

    Italy's Stelvio Glacier has pulled the plug on summer skiing from August 15. It was the last lift-served ski option left standing in continental Europe, and now there's none. Operator SIFAS pointed to persistent heat, storms, and a snowpack that simply wasn't refreezing overnight anymore. The cable car keeps running. Whether skiing comes back later this summer depends on the weather turning - and right now, nobody's promising anything.

    15 Aug 2026
    Maverick Mountain's Only Chairlift Destroyed as Sand Creek Fire Tears Through Montana Ski Area

    Maverick Mountain's Only Chairlift Destroyed as Sand Creek Fire Tears Through Montana Ski Area

    Firefighters saved every base building at Maverick Mountain, Montana, but the resort's sole chairlift didn't survive the Sand Creek Fire. Owners Erik and Kristi Borge say the lift is "most likely" out for the 2026/27 season after flames tore through the mountain on August 8. The wildfire has since grown past 27,700 acres with zero percent containment. It's a gutting result for the tiny, one-lift operation near Dillon - though the lodge, groomers and equipment all made it through untouched.

    15 Aug 2026
    Fairmont Niseko: New Luxury Resort Revives Stalled La Plume Site for Early 2028 Opening

    Fairmont Niseko: New Luxury Resort Revives Stalled La Plume Site for Early 2028 Opening

    Fairmont is bringing its second Japanese property to Niseko, and this one's got history. The 165-room resort will rise on the site of the stalled La Plume project, which collapsed into bankruptcy in 2025 before J-Will Partners bought the site for redevelopment. Set between Mount Yotei and Mount Annupuri, it's slated for an early 2028 opening - putting it in play for the 2027/28 season. Expect two restaurants, a spa, onsen bathing, and a kids' club, a short drive from Niseko Village and Hirafu.

    12 Aug 2026
    Saas-Fee Closes Its Glacier to Summer Skiing as Heat Wave Drags On

    Saas-Fee Closes Its Glacier to Summer Skiing as Heat Wave Drags On

    Saas-Fee is closing its glacier to summer skiing from Monday, August 10 - the second major Swiss resort to shut in under two weeks after Zermatt suspended operations on August 1. Persistent heat and warm nights that won't let the glacier refreeze are behind the call, per Saastal Bergbahnen. That leaves Italy's Stelvio as the only glacier ski area open in the Alps. Reopening could come as early as August 17, though nothing's confirmed - and racing teams are already looking south instead.

    8 Aug 2026
    Ski Pass on Your Smartphone: Dolomiti Superski's Plans for the Next Three Years

    Ski Pass on Your Smartphone: Dolomiti Superski's Plans for the Next Three Years

    Dolomiti Superski's general assembly has unanimously re-elected Andy Varallo for a third consecutive term, running through 2029. Alongside the leadership renewal comes a bigger shift: a Smartpass that puts your ski pass on your smartphone, more AI in guest services, and an expanded Dolomiti Supersummer program. The 46-year-old Alta Badia cable car entrepreneur says the region's marketing is moving beyond skiing alone, toward positioning the Dolomites as a year-round destination.

    4 Aug 2026