SnowStash
ForecastsCompareNews
SnowStash Logo

Live snow, webcams and expert resort guides for the world's mountains - plan your next day on snow.

hello@snowstash.com
Download on the App StoreGet it on Google Play

Destinations

  • Australia
  • Canada
  • Europe
  • Japan
  • New Zealand
  • United States

Company

  • About Us
  • Work With Us
  • Privacy Policy

Explore

  • Compare Resorts
  • News & Updates
  • Snow Forecast
  • Mobile App

© 2026 SnowStash. All rights reserved.

    1. Home
    2. /
    3. News
    EuropeSilvretta MontafonAustria

    Silvretta Montafon Plans New 10-Person Gondola to Replace Ageing Hochjoch Lift

    Michael FultonMichael Fulton·5 Aug 2026

    TL;DR

    Silvretta Montafon wants to retire one of its most distinctive lifts. The plan: a single 10-person gondola running direct from Schruns to 1,870 metres, replacing both the two-stage Hochjoch cable car and the 1985 Kropfen chairlift in one move. Capacity jumps from 620 to 3,000 people an hour, and the mid-station transfer disappears entirely. The public hearing lands August 27, 2026 - construction hasn't been confirmed yet, though lift databases are pointing to 2027.

    Read in the app

    Ski news, snow reports and resort intel in one place.

    Download on the App StoreGet it on Google Play

    Read in the app

    Ski news, snow reports and resort intel in one place.

    Download on the App StoreGet it on Google Play

    Get SnowStash in your Google feed

    Follow us as a preferred source so our stories show up more in Search.

    Advertisement

    Silvretta Montafon wants to replace one of its most recognisable cable cars, and the plan calls for a single gondola doing the job two lifts currently split between them.

    The resort filed a nature conservation permit application at the start of July for a new Hochjoch cable car - a detachable single-cable gondola with 10-person cabins running direct from Schruns to a summit station at 1,870 metres. The system would stretch roughly 3,240 metres and climb more than 1,150 metres in altitude, with a projected ride time of around ten minutes at a top speed of 6 metres per second.

    No more swapping gondolas partway up

    The current Hochjoch lift runs in two sections. Guests board in Schruns, ride to the Kropfen mid-station at 1,335 metres, then have to change gondolas for the second leg up to Kapell. Four cabins altogether, each holding 54 people, keep that system running. The new gondola does away with the transfer completely - cabins would be in constant circulation, so there's no waiting around for a large gondola to depart, and skiers get a straight run to the top even on the busiest mornings.

    The existing Kropfen double lift that the new gondola is replacing.
    The existing Kropfen double lift that the new gondola is replacing.
    Advertisement

    A five-fold jump in capacity

    Where the existing setup tops out at 620 people an hour, the new gondola is designed to move up to 3,000. That capacity gap looks like the real driver behind the project - a four-cabin system simply can't flex the way a modern circulating gondola can, where cabins are arriving constantly rather than on a fixed schedule.

    The Hochjoch lift isn't just a winter fixture, either. Hikers and mountain bikers rely on it through summer as the access point for several Hochjoch routes, and it's currently the only way to get bikes up that side of the mountain.

    The Kropfen chairlift goes too

    The project doesn't stop at the gondola. The old Kropfen chairlift - a fixed-grip, two-person lift built in 1985, capable of moving 1,000 people an hour - is also being retired as part of the same plan. That lift currently takes around seventeen minutes to shuttle riders up towards the higher ski area, a job the new gondola would absorb. One project, two lifts removed from the network. What happens to the land, station buildings, and old lift lines hasn't been detailed yet.

    The location of the new gondola at Silvretta Montafon in Austria
    The location of the new gondola at Silvretta Montafon in Austria
    Advertisement

    The end of a lift dating back to 1966

    Replacing the Hochjoch cable car closes out a fairly unusual chapter in the resort's lift history. The first connection between Schruns and the mountain opened in 1950, with a second section added the following year between Kropfen and the Kapellalpe. That original setup was replaced in 1966 by the four-cabin system still running today, which went through a substantial modernisation in 1992. Two-section gondolas requiring a mid-ride transfer are rare in modern ski infrastructure, which has made this one something of a curiosity among cable car circles - though its limited capacity is exactly why it's being phased out.

    Approval still to come

    Nothing is finalised yet. The public hearing on the permit application is set for August 27, 2026, giving involved parties and immediate neighbours a window to review the project documents. Silvretta Montafon hasn't released investment figures, a manufacturer, or a construction schedule. A specialist lift database lists 2027 as a possible build year, but the resort itself hasn't confirmed that timeline. Until the approval process wraps up, there's no word on when the current Hochjoch cable car will run its final trips or which winter season will see skiers riding the new gondola for the first time.

    About the author

    Michael Fulton

    Michael Fulton

    Melbourne-based skier and snowboarder with 50+ resorts across 5 continents. Specialises in Australian resorts and international resort comparisons.

    50+ resorts visited15 years skiing
    Advertisement

    Keep reading

    More from the SnowStash desk

    View all news →
    New Möseralm Gondola in Fiss: One Ride to the Fisser Joch from 2028/29

    New Möseralm Gondola in Fiss: One Ride to the Fisser Joch from 2028/29

    Fiss is getting the biggest lift project in its history, and the old Möseralm queue has a finite shelf life. A Doppelmayr 10-person gondola will run from the village straight to the Fisser Joch in about 12 minutes, with a new central station, a table-service mid-station and a rooftop viewing platform. Construction starts on 5 April 2027. The old gondola keeps running until the end of winter 2027/28. The catch is that the new one opens for 2028/29.

    27 Nov 2026
    Swiss Avalanche Danger Hits Level 4 From Valais to Glarus

    Swiss Avalanche Danger Hits Level 4 From Valais to Glarus

    Level 4 of 5 avalanche danger is forecast for Monday 23 November from the Valais Alps to the Glarus Alps, and the SLF says to skip ski touring for now. Engelberg, Leukerbad and the Wildhorn are all on the list, while snow on the Bernina pass sent cars sliding off the road and shut it for two hours on Sunday. Early-season snow is welcome, but it is also what is loading the slopes. Here is where the danger sits and what to do about it.

    23 Nov 2026
    California Storm Cycle Delivers 86 Inches at Sugar Bowl and Pulls Openings Forward

    California Storm Cycle Delivers 86 Inches at Sugar Bowl and Pulls Openings Forward

    A run of storms, including an atmospheric river, has buried the Sierra Nevada, with Sugar Bowl recording 86 inches (218 cm) between 14 and 20 November. Resorts across California and Nevada have pulled opening days forward after a dismal last winter. Here is what fell, who is open this weekend and what the forecast brings before Thanksgiving.

    22 Nov 2026
    Purgatory Reveals Seven New Trails and a Colorado Couloir Chairlift Opening in December

    Purgatory Reveals Seven New Trails and a Colorado Couloir Chairlift Opening in December

    Purgatory’s new trail map reads like a warning label. Seven new trails named after Dante’s Divine Comedy arrive with the Colorado Couloir chairlift in December, adding around 40 acres (16 ha) of steep pitches and gladed tree skiing. Five of them are black or double black. The resort opens for the season this Friday, 20 November.

    19 Nov 2026
    Brian Head Becomes First Utah Resort to Open for 2026-27, With Six Trails and a New Snowmaking Pipeline

    Brian Head Becomes First Utah Resort to Open for 2026-27, With Six Trails and a New Snowmaking Pipeline

    Utah’s ski season has started, and it began in the south. Brian Head opened on Tuesday, 17 November, with six trails on the Navajo Express after 14 inches (36 cm) of storm snow and another half foot on opening day. It is the second year running the resort has beaten the rest of the state to first chair, and it has put nearly $1 million into a new snowmaking pipeline that can run 24 guns at once.

    19 Nov 2026
    Heavenly and Northstar Open Friday as Lake Tahoe Snow Stacks Up, With Kirkwood Eyeing an Early Start

    Heavenly and Northstar Open Friday as Lake Tahoe Snow Stacks Up, With Kirkwood Eyeing an Early Start

    Tahoe has gone from dry to deep in a week. Heavenly and Northstar open this Friday, 20 November, with up to 24 inches (61 cm) already down at Kirkwood and 50+ inches (127 cm) in the 10-day forecast. Kirkwood normally waits until December, but this snow might change that. Heavenly is even talking about opening Stagecoach in Nevada early, which almost never happens this soon.

    18 Nov 2026
    Palisades Tahoe Opens Saturday, Four Days Early, After 26 Inches of New Snow

    Palisades Tahoe Opens Saturday, Four Days Early, After 26 Inches of New Snow

    Palisades Tahoe has pulled its opening forward by four days. Lifts spin this Saturday, 21 November, after 26 inches (66 cm) of new snow, with up to 50 more in the forecast. Opening terrain includes Treeline Cirque at Alpine and Gold Coast and Sunkid 1 at Palisades, though the resort says the weather could change the plan. Tickets are $99 through Tuesday.

    18 Nov 2026
    Sugar Bowl Gondola Slips to January 2027 as Opening Day Holds

    Sugar Bowl Gondola Slips to January 2027 as Opening Day Holds

    Sugar Bowl still opens on 27 November, just without its new gondola. The eight-passenger Village Gondola is now targeting January 2027, with all eight towers up, the haul rope on and the first cabin hanging. Until it runs, everyone gets in through the Main Lodge, with curbside drop-off and parking lot shuttles. It replaces the first gondola in the western US, which dates from 1953.

    16 Nov 2026