SnowStash
ForecastsCompareNews
SnowStash Logo

Live snow, webcams and expert resort guides for the world's mountains - plan your next day on snow.

hello@snowstash.com
Download on the App Store

Destinations

  • Australia
  • Canada
  • Europe
  • Japan
  • New Zealand
  • United States

Company

  • About Us
  • Work With Us
  • Privacy Policy

Explore

  • Compare Resorts
  • News & Updates
  • Snow Forecast
  • Mobile App

© 2026 SnowStash. All rights reserved.

    1. Home
    2. /
    3. News
    InterlakenLauterbrunnenSwitzerland

    Lauterbrunnen-Grütschalp Cable Car Reopens 11 July 2026 After Major Renovation

    Michael FultonMichael Fulton·31 May 2026

    TL;DR

    The cable car into Mürren just got a serious upgrade. The Lauterbrunnen-Grütschalp aerial cableway has been fully renovated and reopens 11 July 2026 - new 135-person cabin (up from 100), new drive systems, new valley station layout with separated passenger flows, and an on-site energy storage system. After 478,500 passengers in 2025 alone, the capacity boost is well overdue.

    Level Up Your Ski Day — Download SnowStash on the App Store

    The Lauterbrunnen-Grütschalp cable car - the primary access link to Mürren - reopens on 11 July 2026 following a complete renovation that has been underway since 13 April.

    The upgrade was required under Swiss safety regulations. The cableway went into service in 2006, and after 20 years of operation it needed a full renovation to obtain a new operating licence and ensure reliable service for the next two decades. The new cabin arrived in Lauterbrunnen on 21 May 2026.

    The new cabin being taking through the tight streets of Lauterbrunnen
    The new cabin being taking through the tight streets of Lauterbrunnen. ©️ Garaventa

    Why This Cable Car Matters

    The Lauterbrunnen-Grütschalp line is not just a tourist lift - it's the essential transport link for the car-free village of Mürren and the surrounding area. The cable car climbs 686 metres in around four minutes, and in addition to passengers it can carry up to six tonnes of freight. The mountain station includes a transfer facility where cargo moves onto the narrow-gauge railway, with an average of 5,000 tonnes of materials transported annually.

    The BLM line carried 478,500 passengers in 2025 - a 6.9% increase on 2024 - making it one of the busier mountain transport links in the Bernese Oberland. The previous cabin capacity of 100 passengers had become a genuine bottleneck, particularly in peak summer periods when queues at the valley station were a known frustration for visitors heading to Mürren.

    What's New

    The most visible change is the cabin itself. Capacity increases from 100 to 135 passengers - a 35% improvement at a single stroke - and the new cabin's colour scheme has been updated to match the recently renovated Grütschalp-Mürren adhesion railway trains. The cable car will now operate without a passenger attendant on board.

    Beyond the cabin, the renovation covers the suspension and running gear, the drive control system, safety brake hydraulics, and brake hydraulic units. The drive motors, brake systems, and gearboxes have been overhauled.

    At the valley station in Lauterbrunnen, an additional platform has been built to separate arriving and departing passengers - a practical improvement that addresses the flow issues the previous layout created. Two new escalators and a new lift have also been installed, along with high platform doors.

    The refreshed cabin looks striking as it moves through the mountain terrain.
    The refreshed cabin looks striking as it moves through the mountain terrain. ©️ Garaventa

    Energy Storage Upgrade

    An energy storage system has been installed at the mountain station. Both the cable car and the Grütschalp-Mürren adhesion railway already recover electricity during descent, but previously that energy was fed back into the grid. The new system stores it on-site instead, making it directly available during the ascent. The operator says this will meaningfully reduce grid usage costs and peak demand charges.

    Practical Note for Visitors

    During the closure from 13 April to 10 July 2026, the alternative route to Mürren ran via Stechelberg and the Schilthornbahn cable car. Jungfrau Travel Pass holders had their pass extended to cover the Stechelberg-Mürren route on the Schilthornbahn during this period. The cable car resumes scheduled service on Saturday 11 July 2026 - anyone with a Mürren trip planned from that date onwards will find the main access route back in operation.

    About the author

    Michael Fulton

    Michael Fulton

    Melbourne-based skier and snowboarder with 50+ resorts across 5 continents. Specialises in Australian resorts and international resort comparisons.

    50+ resorts visited15 years skiing

    Keep reading

    More from the SnowStash desk

    View all news →
    Sundance Mountain Resort Is Getting a New High-Speed Quad and More Back Mountain Terrain This Winter

    Sundance Mountain Resort Is Getting a New High-Speed Quad and More Back Mountain Terrain This Winter

    Sundance Mountain Resort's back mountain is finally getting a proper lift. The Electric Horseman Express opens for 2026-27, unlocking a new bowl next to Bishop's Bowl and three expert gladed chutes across roughly 105 fresh acres - on top of the Storyteller ridge run that debuted in preview form last season. It's Sundance's biggest expansion since 1985, and it turns a three-lift slog into a single six-minute ride to Bearclaw Summit.

    19 Aug 2026
    Nassfeld Invests €13 Million in New 6-Seater Chairlift for 2026/27 Season

    Nassfeld Invests €13 Million in New 6-Seater Chairlift for 2026/27 Season

    Nassfeld is putting €13 million into a new 6-seater chairlift, the Tressdorfer Almbahn, connecting Sonnleitn with the Tressdorfer Alm from December 2026. It replaces three ageing drag lifts and will run through summer too, from June 2027, moving up to 2,500 people an hour on the roughly three-minute ride. It's the latest step in Carinthia's largest ski resort building out a genuine year-round offering, following last year's Gartnerkofelbahn gondola.

    17 Aug 2026
    Stelvio Glacier Suspends Summer Skiing, Leaving Continental Europe Without a Lift-Served Slope

    Stelvio Glacier Suspends Summer Skiing, Leaving Continental Europe Without a Lift-Served Slope

    Italy's Stelvio Glacier has pulled the plug on summer skiing from August 15. It was the last lift-served ski option left standing in continental Europe, and now there's none. Operator SIFAS pointed to persistent heat, storms, and a snowpack that simply wasn't refreezing overnight anymore. The cable car keeps running. Whether skiing comes back later this summer depends on the weather turning - and right now, nobody's promising anything.

    15 Aug 2026
    Maverick Mountain's Only Chairlift Destroyed as Sand Creek Fire Tears Through Montana Ski Area

    Maverick Mountain's Only Chairlift Destroyed as Sand Creek Fire Tears Through Montana Ski Area

    Firefighters saved every base building at Maverick Mountain, Montana, but the resort's sole chairlift didn't survive the Sand Creek Fire. Owners Erik and Kristi Borge say the lift is "most likely" out for the 2026/27 season after flames tore through the mountain on August 8. The wildfire has since grown past 27,700 acres with zero percent containment. It's a gutting result for the tiny, one-lift operation near Dillon - though the lodge, groomers and equipment all made it through untouched.

    15 Aug 2026
    Fairmont Niseko: New Luxury Resort Revives Stalled La Plume Site for Early 2028 Opening

    Fairmont Niseko: New Luxury Resort Revives Stalled La Plume Site for Early 2028 Opening

    Fairmont is bringing its second Japanese property to Niseko, and this one's got history. The 165-room resort will rise on the site of the stalled La Plume project, which collapsed into bankruptcy in 2025 before J-Will Partners bought the site for redevelopment. Set between Mount Yotei and Mount Annupuri, it's slated for an early 2028 opening - putting it in play for the 2027/28 season. Expect two restaurants, a spa, onsen bathing, and a kids' club, a short drive from Niseko Village and Hirafu.

    12 Aug 2026
    Saas-Fee Closes Its Glacier to Summer Skiing as Heat Wave Drags On

    Saas-Fee Closes Its Glacier to Summer Skiing as Heat Wave Drags On

    Saas-Fee is closing its glacier to summer skiing from Monday, August 10 - the second major Swiss resort to shut in under two weeks after Zermatt suspended operations on August 1. Persistent heat and warm nights that won't let the glacier refreeze are behind the call, per Saastal Bergbahnen. That leaves Italy's Stelvio as the only glacier ski area open in the Alps. Reopening could come as early as August 17, though nothing's confirmed - and racing teams are already looking south instead.

    8 Aug 2026
    Silvretta Montafon Plans New 10-Person Gondola to Replace Ageing Hochjoch Lift

    Silvretta Montafon Plans New 10-Person Gondola to Replace Ageing Hochjoch Lift

    Silvretta Montafon wants to retire one of its most distinctive lifts. The plan: a single 10-person gondola running direct from Schruns to 1,870 metres, replacing both the two-stage Hochjoch cable car and the 1985 Kropfen chairlift in one move. Capacity jumps from 620 to 3,000 people an hour, and the mid-station transfer disappears entirely. The public hearing lands August 27, 2026 - construction hasn't been confirmed yet, though lift databases are pointing to 2027.

    5 Aug 2026
    Ski Pass on Your Smartphone: Dolomiti Superski's Plans for the Next Three Years

    Ski Pass on Your Smartphone: Dolomiti Superski's Plans for the Next Three Years

    Dolomiti Superski's general assembly has unanimously re-elected Andy Varallo for a third consecutive term, running through 2029. Alongside the leadership renewal comes a bigger shift: a Smartpass that puts your ski pass on your smartphone, more AI in guest services, and an expanded Dolomiti Supersummer program. The 46-year-old Alta Badia cable car entrepreneur says the region's marketing is moving beyond skiing alone, toward positioning the Dolomites as a year-round destination.

    4 Aug 2026